Revision history of "Cost assignment"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 19:29, 9 July 2020QiratH (talk | contribs). . (591 bytes) (+591). . (Created page with "Cost assignment is general term that encompasses both (1) tracing accumulated costs that have a direct relationship to a cost object and (2) allocating accumulated costs t...")