(Created page with "Solution Design Quarter (hereinafter, the ''Quarter'') is the third of four lectures of Project Quadrivium (hereinafter, the ''Quadrivium''): *The ''Quarter'' is desig...")
 
(Lecture outline)
Line 8: Line 8:
 
==Lecture outline==
 
==Lecture outline==
 
''The predecessor lecture is [[Business Analysis Quarter]].''
 
''The predecessor lecture is [[Business Analysis Quarter]].''
 +
 +
*[[Product]].
  
 
#'''[[Systems engineering]]'''.  
 
#'''[[Systems engineering]]'''.  

Revision as of 01:46, 21 March 2018

Solution Design Quarter (hereinafter, the Quarter) is the third of four lectures of Project Quadrivium (hereinafter, the Quadrivium):

  • The Quarter is designed to introduce its learners to enterprise design, or, in other words, to concepts related to creating architecture for achieving enterprise goals; and
  • The Quadrivium examines concepts of administering various types of enterprises known as enterprise administration as a whole.

The Quadrivium is the first of seven modules of Septem Artes Administrativi, which is a course designed to introduce its learners to general concepts in business administration, management, and organizational behavior.


Lecture outline

The predecessor lecture is Business Analysis Quarter.

  1. Systems engineering.
  2. Informational architecture.
  • Action design. A change process based on systematic collection of data and then selection of a change action based on what the analyzed data indicate.
  • Commitment concept. Plans should extend for enough to meet those commitments made when the plans were developed.
  • Gantt chart. A scheduling chart developed by Henry Gantt that shows actual and planned output over a period of time.
  • Load chart. A modified Gantt chart that schedules capacity by entire departments or specific resources.
  • PERT activity. The time or resource needed to progress from one event to another in a PERT network.
  • PERT event. End point that represents the completion of major activities in a PERT network.
  • PERT network. A flowchart diagram showing the sequence of activities needed to complete a project and the time or cost associated with each.
  • Organizational development. A collection of planned change interventions, built on humanistic-democratic values, that seeks to improve organizational effectiveness and employee well-being.
  • Organizational development. Change methods that focus on people and the nature and quality of interpersonal work relationships.

The successor lecture is Project Management Quarter.