Difference between revisions of "Bottom-Up Estimating"
(Created page with "Bottom-Up Estimating is a method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). S...") |
|||
Line 2: | Line 2: | ||
==Definition== | ==Definition== | ||
− | According to [[ | + | According to the [[PMI Lexicon of Project Management Terms]], |
:[[Bottom-Up Estimating]]. A method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). See also analogous estimating, parametric estimating, program evaluation and review technique (PERT), and three-point estimating. | :[[Bottom-Up Estimating]]. A method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). See also analogous estimating, parametric estimating, program evaluation and review technique (PERT), and three-point estimating. | ||
− | [[Category: | + | [[Category: Project Management]][[Category: Articles]] |
Latest revision as of 18:11, 3 July 2020
Bottom-Up Estimating is a method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). See also analogous estimating, parametric estimating, program evaluation and review technique (PERT), and three-point estimating.
Definition
According to the PMI Lexicon of Project Management Terms,
- Bottom-Up Estimating. A method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). See also analogous estimating, parametric estimating, program evaluation and review technique (PERT), and three-point estimating.