(Created page with "Scope Baseline is the approved version of a scope statement, work breakdown structure (WBS), and its associated WBS dictionary that can be changed using formal change cont...")
 
(Changed redirect target from Scope baseline to Project scope baseline)
(Tag: Redirect target changed)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
[[Scope Baseline]] is the approved version of a scope statement, work breakdown structure (WBS), and its associated WBS dictionary that can be changed using formal change control procedures and is used as the basis for comparison to actual results. See also baseline, cost baseline, performance measurement baseline, and schedule baseline.
+
#REDIRECT [[Project scope baseline]]
 
 
==Definition==
 
According to the [[PMI Lexicon of Project Management Terms]],
 
:[[Scope Baseline]]. The approved version of a scope statement, work breakdown structure (WBS), and its associated WBS dictionary that can be changed using formal change control procedures and is used as the basis for comparison to actual results. See also baseline, cost baseline, performance measurement baseline, and schedule baseline.
 
 
 
[[Category: Project Management]][[Category: Articles]]
 