Difference between revisions of "Controlling Quarter"

From CNM Wiki
Jump to: navigation, search
(Practices)
(Methods)
Line 50: Line 50:
  
 
===Methods===
 
===Methods===
*[[Checklist]]. A quality control technique. They may include a standard set of quality elements that reviewers use for requirements verification and requirements validation or be specifically developed to capture issues of concern to the project.
+
#'''[[Peer review]]'''. A validation technique in which a small group of stakeholders evaluates a portion of a work product to find errors to improve its quality.
 +
#*[[Walkthrough]]. A type of peer review in which participants present, discuss, and step through a work product to find errors. Walkthroughs of requirements documentation are used to verify the correctness of requirements. See also structured walkthrough.
 +
#*[[Structured walkthrough]]. A structured walkthrough is an organized peer review of a deliverable with the objective of finding errors and omissions. It is considered a form of quality assurance.
 +
#*[[Inspection]]. A formal type of peer review that utilizes a predefined and documented process, specific participant roles, and the capture of defect and process metrics. See also structured walkthrough.
  
 
===Instruments===
 
===Instruments===

Revision as of 14:14, 30 March 2018

Controlling Quarter (hereinafter, the Quarter) is the first of four lectures of Operations Quadrivium (hereinafter, the Quadrivium):

The Quadrivium is the first of seven modules of Septem Artes Administrativi, which is a course designed to introduce its learners to general concepts in business administration, management, and organizational behavior.


Outline

The predecessor lecture is Business Inquiry Quarter.

Concepts

  1. Enterprise analysis.
  • Controlled processing. A detailed consideration of evidence and information relying on facts, figures, and logic.
  • Automatic processing. A relatively superficial consideration of evidence and information making use of heuristics.
  1. Enterprise result. Any enterprise output, outcome, benefit, and/or drawback that effects somebody or something or may be perceived as effecting somebody or something.
  2. Enterprise performance. The accumulated results of all the enterprise's work activities.
    • Effectiveness. Doing the right things, or doing those work activities that will result in achieving goals.
    • Effectiveness. The degree to which an organization can achieve its ends at a low cost.
    • Efficiency. Doing things right, or getting the most output from the least amount of inputs.
    • Efficiency. The degree to which an organization meets the needs of its clientele or customers.
  3. Controlling. Management function that involves monitoring, comparing, and correcting work performance.
    • Controlling. Monitoring activities to ensure they are being accomplished as planned and correcting any significant deviations.
    • Control process. A three-step process of measuring actual performance, comparing actual performance against a standard, and taking managerial action to correct deviations or inadequate standards.
    • Feedback control. Control that takes place after a work activity is done.
    • Feedforward control. Control that takes place before a work activity is done.
    • Concurrent control. Control that takes place while a work activity is in progress.
  4. Quality control (QC). 1) The process of monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance. 2) The organizational unit that is assigned responsibility for quality control.
    • Quality. The ability of a product or service to reliably do what it's supposed to do and to satisfy customer expectations.
    • Range of variation. The acceptable parameters of variance between actual performance and the standard.
  5. Task performance. The combination of effectiveness and efficiency at doing core job tasks.
    • Task performance. The combination of effectiveness and efficiency at doing your core job tasks.
  6. Earned value (EV). The physical work accomplished plus the authorized budget for this work. The sum of the approved cost estimates (may include overhead allocation) for activities (or portions of activities) completed during a given period (usually project-to-date). Previously called the budgeted cost of work performed (BCWP) for an activity or group of activities.
    • Earned value management (EVM). A method for integrating scope, schedule, and resources, and for measuring project performance. It compares the amount of work that was planned with what was actually earned with what was actually spent to determine if cost and schedule performance are as planned.

Roles

Methods

  1. Peer review. A validation technique in which a small group of stakeholders evaluates a portion of a work product to find errors to improve its quality.
    • Walkthrough. A type of peer review in which participants present, discuss, and step through a work product to find errors. Walkthroughs of requirements documentation are used to verify the correctness of requirements. See also structured walkthrough.
    • Structured walkthrough. A structured walkthrough is an organized peer review of a deliverable with the objective of finding errors and omissions. It is considered a form of quality assurance.
    • Inspection. A formal type of peer review that utilizes a predefined and documented process, specific participant roles, and the capture of defect and process metrics. See also structured walkthrough.

Instruments

Practices

The successor lecture is Process Engineering Quarter.

Materials

Recorded audio

Recorded video

Live sessions

Texts and graphics

See also