Critical Path Method
Revision as of 13:13, 3 July 2020 by QiratH (talk | contribs) (Created page with "Critical Path Method is a method used to estimate the minimum project duration and determine the amount of scheduling flexibility on the logical network paths within the s...")
Critical Path Method is a method used to estimate the minimum project duration and determine the amount of scheduling flexibility on the logical network paths within the schedule model. See also critical path and critical path activity.
Definition
According to Macroeconomics by Mankiw (7th edition),
- Critical Path Method. A method used to estimate the minimum project duration and determine the amount of scheduling flexibility on the logical network paths within the schedule model. See also critical path and critical path activity.