Bottom-Up Estimating
Revision as of 12:46, 3 July 2020 by QiratH (talk | contribs) (Created page with "Bottom-Up Estimating is a method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). S...")
Bottom-Up Estimating is a method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). See also analogous estimating, parametric estimating, program evaluation and review technique (PERT), and three-point estimating.
Definition
According to Macroeconomics by Mankiw (7th edition),
- Bottom-Up Estimating. A method of estimating project duration or cost by aggregating the estimates of the lower-level components of the work breakdown structure (WBS). See also analogous estimating, parametric estimating, program evaluation and review technique (PERT), and three-point estimating.