Pessimistic Duration
Revision as of 19:38, 3 July 2020 by QiratH (talk | contribs) (Created page with "Pessimistic Duration is an estimate of the longest activity duration that takes into account all of the known variables that could affect performance. See also most likely...")
Pessimistic Duration is an estimate of the longest activity duration that takes into account all of the known variables that could affect performance. See also most likely duration, and optimistic duration.
Definition
According to the PMI Lexicon of Project Management Terms,
- Pessimistic Duration. An estimate of the longest activity duration that takes into account all of the known variables that could affect performance. See also most likely duration, and optimistic duration.