Fixed overhead flexible-budget variance

From CNM Wiki
Revision as of 13:05, 10 July 2020 by QiratH (talk | contribs) (Created page with "Fixed overhead flexible-budget variancen is the difference between actual fixed overhead costs and fixed overhead costs in the flexible budget. ==Definitions== According...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Fixed overhead flexible-budget variancen is the difference between actual fixed overhead costs and fixed overhead costs in the flexible budget.

Definitions

According to Cost Accounting by Horngren, Datar, Rajan (14th edition),

Fixed overhead flexible-budget variance. The difference between actual fixed overhead costs and fixed overhead costs in the flexible budget.