Flexible-budget variance

From CNM Wiki
Revision as of 13:06, 10 July 2020 by QiratH (talk | contribs) (Created page with "Flexible-budget variance is the difference between an actual result and the corresponding flexible-budget amount based on the actual output level in the budget period. ==...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Flexible-budget variance is the difference between an actual result and the corresponding flexible-budget amount based on the actual output level in the budget period.

Definitions

According to Cost Accounting by Horngren, Datar, Rajan (14th edition),

Flexible-budget variance. The difference between an actual result and the corresponding flexible-budget amount based on the actual output level in the budget period.