One-level BOM

From CNM Wiki
Revision as of 18:03, 11 July 2020 by Kainat9 (talk | contribs) (Created page with "One-level BOM is all component parts are at the same level in the bill of material, with no sub-assemblies, no "goes into" relationships, no leadtime offset, no structured...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

One-level BOM is all component parts are at the same level in the bill of material, with no sub-assemblies, no "goes into" relationships, no leadtime offset, no structured BOM.

Definitions

According to the Lean Manufacturing by Feld,

One-level BOM. All component parts are at the same level in the bill of material, with no sub-assemblies, no "goes into" relationships, no leadtime offset, no structured BOM.