Flexible budget variance

From CNM Wiki
Revision as of 10:58, 15 July 2020 by EshwaN (talk | contribs) (Created page with "Flexible budget variance is the difference between the flexible budget and actual results. The flexible budget variances are due to something other than volume. ==Definit...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Flexible budget variance is the difference between the flexible budget and actual results. The flexible budget variances are due to something other than volume.

Definitions

According to Managerial Accounting by Braun, Tietz (5th edition),

Flexible budget variance. The difference between the flexible budget and actual results. The flexible budget variances are due to something other than volume.