Overallocated Manufacturing Overhead

From CNM Wiki
Revision as of 13:09, 15 July 2020 by EshwaN (talk | contribs) (Created page with "Overallocated Manufacturing Overhead is the amount of manufacturing overhead allocated to jobs is more than the amount of manufacturing overhead costs actually incurred; r...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Overallocated Manufacturing Overhead is the amount of manufacturing overhead allocated to jobs is more than the amount of manufacturing overhead costs actually incurred; results in jobs being overcosted.

Definitions

According to Managerial Accounting by Braun, Tietz (5th edition),

Overallocated Manufacturing Overhead. The amount of manufacturing overhead allocated to jobs is more than the amount of manufacturing overhead costs actually incurred; results in jobs being overcosted.