Difference between revisions of "Agile vs Waterfall Work"
m (Gary moved page Nature of Projects to Agile vs Waterfall without leaving a redirect) |
|||
Line 1: | Line 1: | ||
− | [[File:Cnm-digital.png|400px|thumb|right|[[CNM Cyber suite]]s]][[Agile vs Waterfall]] (hereinafter, the ''Lectio'') is the [[lectio|lesson part]] of '''[[Project Work Essentials]]''' [[lesson]] that introduces its participants to [[project management]] concepts. This ''lesson'' belongs to the ''CNMCT Entrance'' section of the [[CNM Cyber Placement]]. | + | [[File:Cnm-digital.png|400px|thumb|right|[[CNM Cyber suite]]s]][[Agile vs Waterfall Work]] (hereinafter, the ''Lectio'') is the [[lectio|lesson part]] of '''[[Project Work Essentials]]''' [[lesson]] that introduces its participants to [[project management]] concepts. This ''lesson'' belongs to the ''CNMCT Entrance'' section of the [[CNM Cyber Placement]]. |
Revision as of 23:51, 26 November 2020
Agile vs Waterfall Work (hereinafter, the Lectio) is the lesson part of Project Work Essentials lesson that introduces its participants to project management concepts. This lesson belongs to the CNMCT Entrance section of the CNM Cyber Placement.
Content
The predecessor lectio is What Project Work Is.
Script
- Scripted-work products are those work products that development process is structured and known in details. They would include constructions, non-designer clothing, and foods prepared according to recipes.
- Unscripted-work products are those work products that development process is unstructured or unknown. They would include first ever radio, first ever airplane, and first ever computer. If developers have no instructions for developing something, development of this something is unscripted.
- Creative works such as content development and design always include both scripted and unscripted aspects. Extremely-exclusive web-design can take a few years and more than a million dollars to develop. It can also take few hours and peanuts to clone or modify some existing design. Since schedules for creative works cannot be really calculated, the customer usually simply sets up their project budgets and/or schedules, so developers would manage their effort.
Key terms
Closing
The successor lectio is Parties of Project Work.