Difference between revisions of "CNM Tech Board 2023-09-21"
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | [[CNM Tech Board 2023-09-21]] is the meeting of [[CNM Technology Board]] that occurred on September 21st, 2023. The predecessor meeting is [[CNM Tech Board 2023-09-07]]; the successor meeting is [[CNM Tech Board 2023- | + | [[CNM Tech Board 2023-09-21]] is the meeting of [[CNM Technology Board]] that occurred on September 21st, 2023. The predecessor meeting is [[CNM Tech Board 2023-09-07]]; the successor meeting is [[CNM Tech Board 2023-10-05]]. |
=="Old" businesses== | =="Old" businesses== | ||
===Bureau Farm (Proxmox cluster)=== | ===Bureau Farm (Proxmox cluster)=== | ||
− | * Updates: [[CNM Bureau Farm]], Jitsi/Odoo/HumHub, DNS, Joseph/Nenad, [[ | + | * Updates: [[CNM Bureau Farm]], Jitsi/Odoo/HumHub, DNS, Joseph/Nenad, [[Educaship pfSense]], Natalia to check the [[CNM Lab]] project, make this week last week, monitoring -- [[Telegraf]] + [[InfluxDB]] + [[Grafana]], [[Uptime Kuma]], [[Passbolt]] |
* Discussions: mail server, LDAP, DNS zone, IPv4, what else to do? | * Discussions: mail server, LDAP, DNS zone, IPv4, what else to do? | ||
* Plans: HA test, alpha testing | * Plans: HA test, alpha testing | ||
===WSO2 IS=== | ===WSO2 IS=== | ||
− | * Updates: Natalia to install [[WSO2 IS]] on the [[CNM Lab Farm]] and try to plug to [[Opplet]] and [[ | + | * Updates: Natalia to install [[WSO2 IS]] on the [[CNM Lab Farm]] and try to plug to [[Opplet]] and [[Educaship WordPress]] |
* Discussions: | * Discussions: | ||
* Plans: Gary to make A record | * Plans: Gary to make A record | ||
Line 42: | Line 42: | ||
===Waiting backlog=== | ===Waiting backlog=== | ||
− | # PHP tasks such as [[ | + | # PHP tasks such as [[Educaship MediaWiki]] beyond [[Educaship LDAP]] |
− | # [[ | + | # [[Educaship LDAP]], LDAP-C contractor |
# [[Cloudflare]] | # [[Cloudflare]] | ||
[[Category:CNM Tech Board Meetings]] | [[Category:CNM Tech Board Meetings]] |
Latest revision as of 19:49, 19 June 2024
CNM Tech Board 2023-09-21 is the meeting of CNM Technology Board that occurred on September 21st, 2023. The predecessor meeting is CNM Tech Board 2023-09-07; the successor meeting is CNM Tech Board 2023-10-05.
Contents
"Old" businesses
Bureau Farm (Proxmox cluster)
- Updates: CNM Bureau Farm, Jitsi/Odoo/HumHub, DNS, Joseph/Nenad, Educaship pfSense, Natalia to check the CNM Lab project, make this week last week, monitoring -- Telegraf + InfluxDB + Grafana, Uptime Kuma, Passbolt
- Discussions: mail server, LDAP, DNS zone, IPv4, what else to do?
- Plans: HA test, alpha testing
WSO2 IS
- Updates: Natalia to install WSO2 IS on the CNM Lab Farm and try to plug to Opplet and Educaship WordPress
- Discussions:
- Plans: Gary to make A record
Recording
- Updates: VM-based OBS Studio experiments. 4 cores CPU, 32Gb RAM, 64Gb hard. Natalia to create a kind of instruction, Natalia and Kevin to collaborate
- Discussions: Can we install OBS Studio to VM?
- Plans:
Jitsi
- Updates: Create an instance on the non-clustered Proxmox, Jitsi bandwidth
- Plans: Gary to reach out to previous applicants
- Discussions:
Businesses to watch
Community
Lab Farm (single Proxmox)
- CNM Lab Farm cleanup
"New" businesses
First-priority backlog
- Mail server: mail.opplet.net, mail.bskol.com, mail.cnmcyber.com,
- CNM Lab
- Possibly, get rid of DigitalOcean
Second-priority backlog
- CNM Tube, livestreaming
- CNM Lab Farm, non-cluster Proxmox; for VM project -- Ansible; time tracking
- CNM Campus Farm
Waiting backlog
- PHP tasks such as Educaship MediaWiki beyond Educaship LDAP
- Educaship LDAP, LDAP-C contractor
- Cloudflare