[[CNM Cloud Usable]] (hereinafter, the ''Usable'') is the third phase of [[CNM Cloud Project]] (hereinafter, the ''Project''). A team of developers (hereinafter, the ''Team'') started working on that phase in January of 2020. [[CNM Cloud Embryo]] is the previous phase; [[CNM Cloud Secure]] is the successor one.
+
[[CNM Cloud Usable]] (hereinafter, the ''Phase'') is the third phase of [[CNM Cloud Project]] (hereinafter, the ''Project''). A team of developers (hereinafter, the ''Team'') started working on that phase in January of 2020. [[CNM Cloud Embryo]] is the previous phase; [[CNM Cloud Secure]] is the successor one.
  
  
 
==Up-to-date story==
 
==Up-to-date story==
The ''Usable''  
+
The ''Phase'' inherited practically a [[minimum viable product]] ([[minimum viable product|MVP]]) with all, but [[CNM Talk]], software installed, up, and running. However, the general public couldn't use the plugged in software because of lack of content and usable solutions.
  
Several concepts, lessons learned, and pieces of software that were developed in the [[CNM Cloud Beginnings]] have been utilized in this successor phase. The ''Team'' calls the new phase ''Usable'' because the usable version of the new cloud is going to be developed during this phase. The key developments could be summarized as follows. The ''Team'':
+
The key developments could be summarized as follows. The ''Team'':
 
:#Identified:
 
:#Identified:
 
:#*[[Business need]]s. These needs are expressed in [[#User stories|User stories]];
 
:#*[[Business need]]s. These needs are expressed in [[#User stories|User stories]];
Line 12: Line 12:
 
:#Dramatically increased funding for both technology development and recruitment.
 
:#Dramatically increased funding for both technology development and recruitment.
  
==Deliverables of the Usable==
+
==Deliverables of the Phase==
 
:'''Projected deliverables''':
 
:'''Projected deliverables''':
 
:#[[CNM Cyber]] or a combination of software system capable to execute the [[#User stories|User stories]];
 
:#[[CNM Cyber]] or a combination of software system capable to execute the [[#User stories|User stories]];

Revision as of 00:04, 12 April 2020

CNM Cloud Usable (hereinafter, the Phase) is the third phase of CNM Cloud Project (hereinafter, the Project). A team of developers (hereinafter, the Team) started working on that phase in January of 2020. CNM Cloud Embryo is the previous phase; CNM Cloud Secure is the successor one.


Up-to-date story

The Phase inherited practically a minimum viable product (MVP) with all, but CNM Talk, software installed, up, and running. However, the general public couldn't use the plugged in software because of lack of content and usable solutions.

The key developments could be summarized as follows. The Team:

  1. Identified:
  2. Designed and is implementing a new recruitment process based on the core package of developed technology;
  3. Dramatically increased funding for both technology development and recruitment.

Deliverables of the Phase

Projected deliverables:
  1. CNM Cyber or a combination of software system capable to execute the User stories;
  2. Contracts between Friends Of CNM and Careerprise contractors to run:
  3. Contracts between Friends Of CNM and members of WorldOpp Fellow Staff to run:
  4. Curricula at CNM Cert:
  5. Organizational structures:

Current state

Developers

Main wikipage: WorldOpp Fellow Staff
The WorldOpp Fellow Staff is the development group that works on the Project.

Completion rates

The DREPD is the development cycle that includes 4 components: (1) discover, (2) research, (3) envision, and (4) plan. No component is fully developed to the date. The following table presents estimates on every component of every software to be launched:
CNM software Service Sprint Description Discover Research Envision Plan
Platform Servers (temporarily, outsourced) Second Requirements and designs are drafted in Russian in CNM Lab; DigitalOcean is temporarily used for implementations 90% 90% 90% 90%
Opplet Opplet.net Fourth Requirements and designs are drafted in Russian in Fixett; Opplet.net handles identity and access management for CNM Cloud 75% 75% 75% 75%
Apps
Labware Lab Second Requirements and designs are drafted in Russian in Fixett; the current implementation is located at a classified URL 50% 50% 50% 50%
Certware Cert Second Requirements and designs are drafted in Russian in Fixett and English in CNM Wiki; the current implementation is located at https://cert.friendsofcnm.org 50% 50% 50% 50%
Wikiware Wiki Second Requirements and designs are drafted in Russian in Fixett and English in CNM Wiki; the current implementations are located at https://wiki.ksacerts.com and, in Russian, at https://wiki.friendsofcnm.org/ru 50% 50% 50% 50%
Pageware CNM Page Second Requirements and designs are drafted in English in CNM Wiki; the first instance is installed at https://friendsofcnm.org; its requirements have been started at FriendsOfCNM.org 50% 50% 50% 50%

Challenges

Lack of procurement documentation is still the primary obstacle for the Project to move forward faster. There are a plenty of developers ready to implement technical requirements, but those requirements are needed to be documented. If some backup has been de-facto implemented, the state of cyber-security is either inappropriate or unknown.

Vacancies

Neither education nor experience is needed for the vacancies listed below. Full-time (at least, 40 hours a week) availability and willingness to learn on the job (and any learning includes so-called "errors" and "mistakes") are absolute musts. Since English language is the primary medium at Friends Of CNM, some level of English capacity is needed as well.